Gemini 4 Carbon vs Gemini 4 Neon
which Gemini 4 tier to pick. Prices read from vendor pages on 2026-11-26.
Gemini 4 Carbon
- Input / 1M
- $2.00
- Output / 1M
- $10.00
- One support turn
- $0.009
- Runs per $1
- 111
Gemini 4 Neon
- Input / 1M
- $3.00
- Output / 1M
- $15.00
- One support turn
- $0.0135
- Runs per $1
- 74
The short answer
Gemini 4 Carbon is cheaper in all three scenarios — about 1.5x cheaper than Gemini 4 Neon for one support turn. If price were the only axis, Gemini 4 Carbon wins; but quality is not in a price table, so check the two things below against your own workload before you switch.
Line-by-line pricing
| Item | Gemini 4 Carbon | Gemini 4 Neon |
|---|---|---|
| Input / 1M | $2.00 | $3.00 |
| Cached input / 1M | $0.1000 | $0.1500 |
| Output / 1M | $10.00 | $15.00 |
| Context window | 1,000K | 1,000K |
| Output vs input | 5.0× | 5.0× |
| Pricing caveat | $2.00 / $10.00 through Nov 30, 2026; $4.00 / $20.00 from Dec 1, 2026 | Implicit caching only |
The caveat row is quoted from the vendor listing: it carries the conditions (long context, batch, regional endpoints) that a bare unit-price comparison hides.
What a real request costs
| Scenario | Gemini 4 Carbon | Gemini 4 Neon | Difference |
|---|---|---|---|
| One support turn (2,000 in / 500 out) | $0.009 | $0.0135 | +50% |
| Document Q&A (20,000 in / 2,000 out) | $0.0600 | $0.0900 | +50% |
| One agent step (120,000 in / 8,000 out) | $0.3200 | $0.4800 | +50% |
The difference column is how much more the right-hand model costs; a negative number means the right side is cheaper.
Three things that change the answer
- Output length — quadrupling the output does not change the winner; this pair is not output-sensitive.
- Caching — both publish a cached-input price: $0.1000 for Gemini 4 Carbon versus $0.1500 for Gemini 4 Neon per 1M tokens. If you resend the same system prompt every call, this is the row that sets your effective price.
- Context and step-ups — Gemini 4 Carbon lists 1,000K of context, Gemini 4 Neon lists 1,000K. Past that limit you either get a 400 or a step-up rate that moves the bill — read the caveat row above.
Related comparisons
Run your own numbers
Frequently asked questions
Is Gemini 4 Carbon or Gemini 4 Neon cheaper?
Input is $2.00 for Gemini 4 Carbon versus $3.00 for Gemini 4 Neon; output is $10.00 versus $15.00 per 1M tokens. For one support turn (2,000 in / 500 out) that is $0.009 against $0.0135.
Does a longer answer change the answer?
Not materially. Raise the output to 2,000 tokens and Gemini 4 Carbon stays cheaper.
How current are these prices?
They were read from each vendor's official pricing page on 2026-11-26. Vendors change prices without notice, so confirm on the official pages before committing a budget.