Gantt chart template
Task, owner, start, end, duration and % done — sortable, no chart needed.
What is Gantt chart template
A Gantt chart is a list of tasks with start and end dates, ordered so the overlaps are visible. In Excel the most useful version is not a drawn bar chart but a table where duration and days-remaining are formulas — that table sorts, filters and updates, which a picture does not.
This tool needs no input.
🔒 Everything runs in your browser. Nothing is uploaded.
What this tool actually does with your file
- Where it runs
- In your browser, on this page
- Upload
- None — the file never leaves your device
- Offline
- Works with the network disconnected
What the columns do
Task, owner, start, end, duration, percent done and a derived status. Duration is =End−Start in days, because Excel stores dates as day numbers; status is =IF(%done>=1,"Done","In progress").
Why there is no bar chart in the file
A drawn chart cannot be filtered or sorted, and it breaks the moment a date moves. The dates and durations are the part that stays true. If you want bars, select task, start and duration and insert a stacked bar chart — the data is already shaped for it.
When not to use it
When you need dependencies and critical path. A table shows overlaps, not sequencing logic. Past about twenty tasks with real dependencies, a project tool earns its keep. Update percent done weekly rather than at the end. A schedule where every task is 0% until the last day tells you nothing about whether you are behind. Dates must be real dates, not text, or duration returns an error instead of a number of days.
How to use
- 1.Click Generate — the .xlsx is built in your browser.
- 2.Open it in Excel, Google Sheets or Numbers.
- 3.Replace the sample rows with your own data; the totals recalculate.
How this compares
There are three ways to do this conversion: in the browser (this page), through a server-side converter, or with a desktop app. The useful difference is not speed — it is where your file goes and how far the free tier actually reaches.
| Aspect | This tool | Upload-based converters | Desktop software |
|---|---|---|---|
| Where the file is processed | In your browser, on this page | On the vendor's servers, after an upload | On your own machine, after installing an app |
| Account required | No | Usually — free tiers ask you to sign in before lifting a limit | No, though a licence may be needed |
| Size you can process for free | No size cap, no run limit | A few files per hour, or a ~5–10 MB cap before a paywall | Whatever your disk and RAM allow |
| Price | Free. Pro is $9/month, and only buys larger files and AI features | Usually a subscription — roughly $7–15/month as of November 2026 | A one-off licence, or a subscription |
| Works offline | Yes, once the page has loaded | No | Yes |
| Time before work starts on a 20 MB file | Immediate — there is nothing to upload | Dominated by the upload — about 16 s on a 10 Mbps uplink | Just the app launch |
| What it cannot preserve | Formulas become their last computed value; merged cells and styles are dropped | The same — the conversion is the same maths | The same, though some desktop apps re-render styles more faithfully |
Server-side converters are genuinely better at some things: very large files, sharing results with a team, keeping a conversion history, and automating batches from a script. For the case in front of you — one file, one format change, right now — they mostly add an upload wait and a sign-up form.
Frequently asked questions
What exactly is in the gantt chart template file?
7 columns (Task, Owner, Start, End, Duration (days), % done, Status) and 4 sample rows with live formulas. Duration is =End − Start in days (Excel stores dates as day numbers, so subtraction works directly).
Is my data uploaded when I download it?
No. The workbook is built by JavaScript in this page from a fixed structure — no file is sent anywhere, and nothing you type later leaves your machine either.
Why is there no coloured bar chart in the file?
Because a drawn chart cannot be filtered or sorted, and it breaks the moment a date changes. The dates and duration formulas are the part that stays correct; add a bar chart from them if you need the visual.
What this kind of conversion cannot keep
Spreadsheet conversion is lossy by nature: a workbook carries formulas, styles, merged cells and multiple sheets, while CSV carries rows of text. This tool keeps values and order, recalculates nothing, and drops presentation on purpose. That is why it can run without a server — and why a converted file will not look like the original.
More in Spreadsheets & Docs
On this page
- What is Gantt chart template
- What it does with your file
- How it actually behaves
- How to use it
- How this compares
- FAQ
Excel formula reference
29 functions with syntax, arguments and a table you can retype.
Browse the list →